Select Page
The decent start to May means three Crub foundations and posts have been done and one finished in Stornoway. 6.4M, 9.6 and 12.7M sizes and all with different gable configurations. Plenty more to do and then a trip to start crubs in Dingwall and Aberdeen.

Now, to wait for days for the concrete to harden

Perfectly aligned recycled plastic posts in whole batches of concrete

Nearly there

A difficult site which needed an excavator

Latest Hebcrub finished in Stornoway

Door handle and latch details

Power barrow essential to move materials over a steep site